Client: İstanbul Metropolitan Municipality

Name of Project: Avcılar Main Collector Connection

Location: Avcılar / İSTANBUL / TÜRKİYE

Completed Date: 2012, January 12

Scope of Works: Mechanical Installation Waste Water Connection, Pipeling Ø800 – 2600 mm Pipe, Pipeling Ø300-600 mm Insulated Pipe

The Amount of Workdone:

  • Connection Avcılar Collector to Marmara Main Collector

  • Excavation: 96.700 m³

  • Sheet Pile (Palplanj): 45.500 m²

  • Filling: 27.400 m³

  • Pipelining Pipe (Ø800-2600): 3.500 mt

  • Pipelining Insulated Pipe (Ø300-600): 6.000 mt