Client: İstanbul Metropolitan Municipality
Name of Project: Construction for Europe Side Road and Natural Gas – PTT Pipelining
Location: İKİTELLİ / İSTANBUL / TÜRKİYE
Completed Date: 2007, June 15
Scope of Works: Excavation, Filling, All Types of Pipelining (Ø300-1000mm), Spreading and Compacting, Ductile Iron Pipelining, Manhole Works, Electrical Works, Natural Gas and PTT Works, Transportation.
The Amount of Workdone:
Excavating: 419.000 m³
Filling Rock: 118.500 m³
Valve (Ø100-250mm): 10 ea
Plywood: 33.000 m²
Concrete: 33.500 m³
Iron Works: 23.000 kg
Pipelining (Ø300-1000mm): 12.000 mt
Spread and Compress: 130.200 m³
Ductile Pipe Pipelining: 4.600 mt
Manhole Works: 140 ea
Electrical Works: 3.300 mt
Natural Gas and PTT Works: 4.200 mt
Transporting: 985.000 kg