Client: Antalya Metropolitan Municipality ASAT – Antalya Metropolitan Water and Sewerage Administration / ANTALYA
Name of Project: The Contractor of the Waste Water Treatment Project of Antalya Including Upgrading the C.13-R1 Pipelines, Rehabilitation and Renewation the Countred Locate Placed in the Group I / ANTALYA / TURKEY
Completed Date: 2005, April 30
Scope of Works:
Pipeling of (Every Kind Ground) Ø100–300mm HDPE Pipes
Ø500–800mm Steel Pipe
Pipeling Fresh Water
Renewation of the Countred Locate Placed Works
The Amount of Workdone:
Pipeling Ø100–300mm HDPE Pipe: 11,350 mt
Pipeling Ø500–800mm Steel Pipe: 2,650 mt
Ø100–800mm Resilient Seat Valve: 95 pcs
Valve Room and Equipments: 1 pcs
Fire Equipments: 12 pcs
Pipeling Fresh Water and Renewation: 140 pcs